Welcome to the Jinrui Crane-Overhead Crane_Gantry Crane_Jib Crane Lifting Equipment Manufacturer The official website
more
Products
products

Hoist Double Girder Overhead Crane

Hoist Double Girder Overhead Crane Double Girder Overhead Crane Description Double girder overhead crane is composed of box type bridge frame, lifting trolley, crane traveling mechanism, and electrical system. It is rely on the bridge frame

Send Inquiry

Hoist Double Girder Overhead Crane

 

Double Girder Overhead Crane Description 

Double girder overhead crane is composed of box type bridge frame, lifting trolley, crane traveling mechanism, and electrical system. It is rely on the bridge frame along the workshop orbital direction moving longitudinal, the trolley along the main beam direction moving transverse and the hook lifting movement to work.
 
The double girder overhead crane with a hook, have only a set of lifting mechanism. More than 16/3.2 tons of double girder overhead crane with two hooks, it has two independent sets of hoisting mechanism. The main hook used to lift heavy objects, the auxiliary hook lift light objects, in which the rated load range can also be used for collaborative main hook tilting or tipping the material. But must pay attention, do not allow the two hooks lift two goods at the same time. If the two hooks work together, the weight of the object will not exceed the rated lifting weight of the main hook.
 
Double girder overhead crane allocation hook used in machining, assembly workshop, metal workshop, metallurgy and casting workshop and warehouse handling work; allocation of grab is suitable for metallurgy, cement, chemical or open fixed span in bulk material handling.
 
 

Double Girder Overhead Crane Feature

1.Light weight, large load, strong wind resistance and so on.
2.Reasonable structure and favorable performance.
3.Smooth starting and stopping.
4.Safe and reliable traveling, long life.
5.Low noise, commodious cabin with good view.
6.High quality automatic welding and NDT inspection
7.Designed according to your requires

overhead crane

overhead crane
 
Packing & Delivery
1. Delivery time
  Within 15 ~20 business day after the receipt of deposit.
2. Packaging
 Wood case for electric parts, accessories;large sections will be loaded onto bulk cargo ship after packing.

overhead crane