Welcome to the Jinrui Crane-Overhead Crane_Gantry Crane_Jib Crane Lifting Equipment Manufacturer The official website
返回列表
您当前的位置:Home > News > Company news >
Gantry crane long-term storage
Time:2019-12-06 16:32 The author:Jin Rui

Gantry crane long-term storage

1. It should be parked indoor and keep dry room, if have to stop outside, should choose a flat floor and lay a wooden board. Cover it with a rag after parking;
 
2. Before long-term storage, the gantry crane must be maintained and repaired, and the damaged parts must be thoroughly cleaned to maintain a good technical condition;
 
3. The arrangement of the stopping port shall ensure that the entry and exit of any machine is not affected;
 
4. The fuel control lever of the gantry crane should be set to the idle position, and each control lever should be set to the neutral position.
 
double girder gantry crane

Last:How to choose the lifting wire rope?
Next:How to check the electric hoist contactor